Presentation

The plant, consisting of three biomass boilers in Cavalese, feeds the district heating network, with a total of 617 utilities installed between 1999 and 2020. The biomass plant is integrated with a high-yield cogeneration that can generate the electricity needed for the plant’s self-consumption and with a system of fossil methane gas emergency boilers. The biomass operating thermal power is 13.5 MW, while the emergency power is 8 MW.

Renewable Energy Plant size (ha.):
1 hectares
Total area size (ha.):
1 hectares
Nominal electrical power (MW)
1
Net electric production typically yielded to the grid / Energy yield / Produced Generated Energy (GWh o KWh)
9
Year of commissioning
December 17, 2020
Grid
8
PEARLS Type / REL landscape:
Natural areas
Energy/Power Plant technology
Mixed
The present Energy/Power Plant involves:
Companies/Firms Consortium, Citizen Groups
Spatial Planning processes and procedures related to this Energy/Power Plant are:
Environmental Impact Assessment
Energy/Power Plant Associated Landscape:
Mountain
Natural areas
Forest
Urban areas/fabric
Residential

In the municipality of Cavalese in Val di Fiemme, Trentino, a biomass-powered district heating plant is located whose energy comes from the processing waste of local sawmills and carpentry, which today replaces more than 3,500,000 liters of diesel and produces electricity and thermal energy distributed through local networks. This cogeneration plant amounts to 1 MW electric and to 23 MW thermal. The BioEnergia Group holds other production facilities in Trentino where anaerobic digestion is carried out for the treatment of organic fraction, capable of producing renewable electricity and high quality compost. On the roof of the plant is located a photovoltaic system that can meet some of the power plant’s electrical energy needs, and provides excess power to the local grid.

As virtuous example of the interaction between quality architecture and sustainable processes linked to the biomass-energy supply chain, the building constitutes the expansion of the old existing power plant. Managed by Bioenergia Fiemme, a public company whose members, besides the Municipality, are the Comunità di Fiemme (Community of Fiemme) as owner of the woods, the sawmills that work on the territory, the citizens as users of heat and the Cassa Rurale di Fiemme (Rural Fund of Fiemme). The thermal energy produced is distributed to the domestic users of the town of Cavalese, while the electric energy is distributed by the municipality, owner of the electricity network.

bioenergiafiemme_organic waste.jpg 4 years ago
  • You must to post comments
  • You must to post comments
biomass 1.jpg 4 years ago
  • You must to post comments
biomass 3.jpg 4 years ago
  • You must to post comments
biomass 4.jpg 4 years ago
  • You must to post comments
Showing 5 results
PEARLS Type / REL landscape:
Energy/Power Plant technology
The present Energy/Power Plant involves:
Spatial Planning figures related to this Energy/Power Plant are:
Energy/Power Plant Associated Landscape:
Topography
Agriculture
Natural areas
Water areas
Urban areas/fabric